Follow all updates of ATB Riva Calzoni activities around the world.

ATB at Apemec 2017
14 July 2017

ATB at Apemec 2017

ATB Riva Calzoni and Hydro Energia participated in the annual exhibition for Small Hydro Power in Santiago de Chile.

Facebook Twitter Google+ Read more
ATB at OGA 2017
11 July 2017

ATB at OGA 2017

The Southeast Asia’s largest petroleum industry exhibition will take place from July 11-13 at the Kuala Lumpur Convention Centre, KLCC, Malaysia.

Facebook Twitter Google+ Read more
Wind turbines ATB 60.28 DD installation
06 July 2017

Wind turbines ATB 60.28 DD installation

In September two more equipements will be installed in Trapani and Marsala (Sicily).

Facebook Twitter Google+ Read more
The future is renewable
24 June 2017

The future is renewable

An interview with the vicepresident of ATB Riva Calzoni published in Il Pianeta Terra Magazine

Facebook Twitter Google+ Read more
Rapid Project Bullet Tanks F load out
23 June 2017

Rapid Project Bullet Tanks F load out

MMHE-ATB has been currently engaged with the fabrication of 7 pressure vessels for Rapid project, the refinery and petrochemical integrated project by Petronas, in Pengerang.

Facebook Twitter Google+ Read more
ATB 60 kw Wind Turbine
13 June 2017

ATB 60 kw Wind Turbine

The wind turbine, manufactured in the new site of Artogne, has shipped to the plant in Lercara Friddi, in the province of Palermo.

Facebook Twitter Google+ Read more
ATB in Russia
01 June 2017

ATB in Russia

We successfully completed the fabrication of one ammonia converter for the largest producer of phosphate-based fertilisers, phosphoric and sulphuric acids in Europa

Facebook Twitter Google+ Read more
Crescere con Energia
26 May 2017

Crescere con Energia

Friday 26th May2017| 10.30 am| Università degli Studi di Brescia, via Branze 43 (hall B1.4)

Facebook Twitter Google+ Read more

No more content

No more pages to load

Next page